Selected Past Projects
Prior to Joining PEC
Green Infrastructure
Eugene Bus Rapid Transit
Our staff led the development of drainage design, erosion control plan, and stormwater management for the 5.5 miles of the new $90M Bus Rapid Transit (BRT) system.
Orange Memorial Park Stormwater Capture
Our staff led the development of the division structure and conveyance system for the first large-scale stormwater capture system in the bay area.
C-TRAN Bus Rapid Transit
Our staff led the development of drainage, stormwater treatment, detention, erosion and sediment control plan for the first Bus Rapid Transit system in the region.
Caltrans Stormwater Mitigation Design
Our staff led the development of stormwater mitigation design for approximately 9 miles along state route 60. The project will capture runoff from over 53-acres of impervious area.
Pipeline Design, Condition Assessment, Rehabilitation
Pure Water Soquel Pipeline
Our staff assisted with program management for the construction of a 9 miles pipeline through a progressive design-build contract.
San Jose Stormwater Outfall Rehabilitation
Our staff led the rehabilitation design of the severely deteriorated stormwater outfalls in highly sensitive areas throughout the city.
Portland Large Diameter Sewer Rehabilitation
Our staff led the evaluation and condition assessment for 5.5 miles of over 100-years old cast-in-place large diameter combined sewer pipelines/tunnels.
University Ave Pipeline Condition Assessment
Our staff led the inspection and evaluation of approximately 10,000 feet of 15- to 27-inch diameter pipeline.
Transportation
Cornelius Pass Road Extension and At-Grade Rail Crossing
Our staff led the utility design, erosion control protection and stormwater management design for the expansion of TV highway.
East Link Light Rail Segment A
Our staff assisted with the development of utility plans (storm, sewer, domestic water, fire service, and irrigation) for the 6.9-miles of the first-ever light rail over a floating bridge.
Shoup Bridge Replacement
Our staff led the development of the drainage, stormwater treatment, erosion and sediment control plan for this highly sensitive area project.
BART Extension to San Jose Phase II
Our staff assisted with program management of 5.5 miles of new rail extension and 4 new stations. This is the largest capital improvement project in the region.
Stormwater
LA County Green Infrastructure Manual
Our staff led the development of LA County green streets standard guidelines and details manual to meet the specific conditions, needs, and requirements of the county
Glenwood Station Bus Parking
Our staff led the development of the drainage and stormwater treatment system for the expansion of the bus parking and building for the Glenwood Station.
Deadrun Stream Restoration
Our staff assisted with the restoration design of 4,700 feet of Dead Run stream. The project will prevent the loss of sediment and nutrients to the downstream water.
ODOT Molalla Roadway Expansion
Our staff led the development of the conveyance system, stormwater management design. The project provides a safe pedestrian path along the highway.