Selected Past Projects

Prior to Joining PEC

Green Infrastructure

Stormwater Rain Garden, Bioretention, Green Infrastructure
Large Scale Stormwater Capture Project, Green Infrastructure, Bay Area, South San Francisco, hydrailic and hydrology
Bioretention, Green Infrastructure, stormwater management
Stormwater Management, Green Infrastructure, BMP, Caltrans, highway runoff

Eugene Bus Rapid Transit

Our staff led the development of drainage design, erosion control plan, and stormwater management for the 5.5 miles of the new $90M Bus Rapid Transit (BRT) system.

Orange Memorial Park Stormwater Capture

Our staff led the development of the division structure and conveyance system for the first large-scale stormwater capture system in the bay area.

C-TRAN Bus Rapid Transit

Our staff led the development of drainage, stormwater treatment, detention, erosion and sediment control plan for the first Bus Rapid Transit system in the region.

Caltrans Stormwater Mitigation Design

Our staff led the development of stormwater mitigation design for approximately 9 miles along state route 60. The project will capture runoff from over 53-acres of impervious area.

Pipeline Design, Condition Assessment, Rehabilitation

Groundwater recharge, pipeline design, Progressive Design Build
Large Diamter Pipeline Outfall Rehabilitation
large diameter pipe rehabilitation trenchless technology
Cured-in-Place-Pipe (CIPP) lining pipe bursting, pipe rehabilitation

Pure Water Soquel Pipeline

Our staff assisted with program management for the construction of a 9 miles pipeline through a progressive design-build contract.

San Jose Stormwater Outfall Rehabilitation

Our staff led the rehabilitation design of the severely deteriorated stormwater outfalls in highly sensitive areas throughout the city.

Portland Large Diameter Sewer Rehabilitation

Our staff led the evaluation and condition assessment for 5.5 miles of over 100-years old cast-in-place large diameter combined sewer pipelines/tunnels.

University Ave Pipeline Condition Assessment

Our staff led the inspection and evaluation of approximately 10,000 feet of 15- to 27-inch diameter pipeline.

Transportation

PEC Water staff provide stormwater management for the Highway Expansion projects, stormwater and drainage design
Rail stormwater management, bridges
bridges stormwater management BMP drainage, hydrailic and hydrology
tunnels and rails stormwater management program management

Cornelius Pass Road Extension and At-Grade Rail Crossing

Our staff led the utility design, erosion control protection and stormwater management design for the expansion of TV highway.

East Link Light Rail Segment A

Our staff assisted with the development of utility plans (storm, sewer, domestic water, fire service, and irrigation) for the 6.9-miles of the first-ever light rail over a floating bridge.

Shoup Bridge Replacement

Our staff led the development of the drainage, stormwater treatment, erosion and sediment control plan for this highly sensitive area project.

BART Extension to San Jose Phase II

Our staff assisted with program management of 5.5 miles of new rail extension and 4 new stations. This is the largest capital improvement project in the region.

Stormwater

stormwater management with green infrastructure manual
stormwater management green infrastructure rain garden bioretention
stream restoration hydraulic and hydrology modeling floodplain floodway
Molalla1.jpg

LA County Green Infrastructure Manual

Our staff led the development of LA County green streets standard guidelines and details manual to meet the specific conditions, needs, and requirements of the county

Glenwood Station Bus Parking

Our staff led the development of the drainage and stormwater treatment system for the expansion of the bus parking and building for the Glenwood Station.

Deadrun Stream Restoration

Our staff assisted with the restoration design of 4,700 feet of Dead Run stream. The project will prevent the loss of sediment and nutrients to the downstream water.

ODOT Molalla Roadway Expansion

Our staff led the development of the conveyance system, stormwater management design. The project provides a safe pedestrian path along the highway.